Category: Projects

Projects

U.S. Midwest Depth of Cover Analyses

DoC Mapping performed a series of depth of cover analyses for 11 different large river/lake crossing sites across the midwest United States during the months of April through July in 2016. Each river crossing consisted of two to three line-crossings per site. DoC Mapping utilized electromagnetic locating sensors, multibeam sonar, and side scan sonar in unison, resulting in one of our best data-set packages to date!
Projects

Depth of Cover Analysis on Lake Norman, North Carolina

Doc Mapping performed a depth of cover analysis on two lines that have multiple water crossings between residential penninsulas located on Lake Norman. The total crossing distance was 7 miles!
Projects

Pre-Dredging Depth of Cover Analyses in ICW, Florida

DoC Mapping performed depth of cover analyses for 13 lines that cross the Intracoastal Waterway near Ft. Lauderdale, Florida. DoC Mapping utilized multiple sensor packages for this project including electromagnetic locating sensors, a multibeam sonar, and a sub-bottom profiler. This was part of a pre-dredge planning operation.
Projects

Pre-Dredging Depth of Cover Analyses, Michigan

DoC Mapping performed depth of cover analyses for 12 line crossings near Detroit, Michigan. DoC Mapping utilized multiple sensor packages for this project including electromagnetic locating sensors, a multibeam sonar, and a sub-bottom profiler. This was part of a pre-dredge planning operation.
Projects

Depth of Cover Analysis in Pearl River, Mississippi

DoC Mapping performed a depth of cover analysis for 2 lines crossing the Pearl River in Mississippi. DoC Mapping utilized a flexible Shallow Water Sensor Suite for this project.
Projects

Depth of Cover Analyses, Mississippi & Missouri Rivers

DoC Mapping performed two depth of cover analyses — one crossing the Mississippi River near St. Louis and another crossing the Missouri River near St. Joseph.
Projects

Depth of Cover Analysis in Ontario, Canada

DoC Mapping performed a depth of cover analysis for 18 different crossing sites spanning the Canadian province of Ontario. DoC Mapping utilized a flexible Shallow Water Sensor Suite for this project.
Projects

Topographic & Bathymetric Studies, Pennsylvania

DoC Mapping performed a series of topographic and bathymetric studies on various rivers and creeks throughout Pennsylvania contributing to route preparation for a new pipeline.
Projects

Topographic & Bathymetric Studies, Georgia

DoC Mapping performed a series of topographic and bathymetric studies on various small rivers throughout Georgia contributing to route preparation for a new pipeline.
Projects

Pre-Dredging Depth of Cover Analysis in Lower Fox River, Wisconsin

DoC Mapping performed a depth of cover analysis last month on a large section of the Lower Fox River in Green Bay, WI. Seventeen (17 ) utilities crossing under the Fox River were located in 12 days!

Have a Project Challenge? Get in Touch!